Methods Design & Engineering

Baheya Foundation Hospital

Sheikh Zayed, Egypt

Client
Baheya Foundation
Sector
Healthcare
Area
18,330 m² landscape area, 31,350 m² waste plan area
Date
—
Scope
Compliance report for LEED Gold certification (LEED v4 BD+C: Healthcare). Landscape, architectural, structure and MEP design packages. Waste management plan.
Status
—
In alliance with
Algorithm Architecture
Discipline
Sustainability, Design, Environmental engineering

We have worked with Baheya Foundation Hospital on three scopes: sustainability compliance for the building, a landscape expansion of the campus, and a plan for the hospital's waste from source to disposal.

LEED Gold compliance

  • Sustainability studies: site and context analysis, including orientation, envelope and facade studies, to reduce running costs and improve human comfort
  • User experience and efficiency improved through sustainable design implementation
  • Operational cost reduction: strategies to lower operating costs over the long term
  • Material and energy analysis: materials, energy consumption and architectural treatments studied for each project element

Landscape expansion

A landscape expansion conceived as a welcoming outdoor extension of the hospital campus. It is designed to support wellbeing and community engagement, and works as a flexible venue for sports activities and public events.

Landscape expansion, project site
Theater view
Site plan

Waste management plan

  • Waste characterization: assessing waste types and quantities
  • Primary storage and segregation: estimating waste generation, optimizing healthcare waste segregation and recommending vendors
  • Internal collection routes: defining collection paths, storage needs and the best central storage locations
  • In-house treatment: proposing treatment solutions, unit locations and waste stream management
  • Disposal strategy: recommending specialized companies for waste disposal
Waste collection flow

Back to top